Foma
QUALITà E ORGANIZZAZIONE AL VOSTRO SERVIZIO
  • Slide
  • Slide


Copper pipes for air conditioning and refrigeration

LWC for air conditioning and refrigeration

LWC for air conditioning and refrigeration

LWC for air conditioning and refrigeration
The copper tube CUPRUMFOMA FROSTEN can be used in all plants for air conditioning and refrigeration and it is suitable for the use of refrigerating gas consistent with copper like R407, R410A and R32.
The in-line production control by defectomat and the continuous control of the external diameter and wall thickness guarantee the maximum safety of the FROSTEN tubes. The tubes are supplied clean, internally degreased and capped. They are produced according to the EN 12735-1 and -2 standards and they also comply with the ASTM B280 specifications.

Production range of LWC FrostEn* according to EN 12735-1
Dimensions OD
x wall thickness
Dimensions OD
x wall thickness
LWC
weight
Weight
per pallet
inches mm m m
1/4" 6,35 x 0,8 100-150-300 max. 1200 ca.
3/8" 9,52 x 0,8 100-150-300 max. 1200 ca.
1/2" 12,70 x 0,8 100-150-300 max. 1200 ca.
1/4" 6,35 x 1 100-150-300 max. 1200 ca.
3/8" 9,52 x 1 100-150-300 max. 1200 ca.
1/2" 12,70 x 1 100-150-300 max. 1200 ca.
5/8" 15,87 x 1 100-150-300 max. 1200 ca.
3/4" 19,05 x 1 100-150-300 max. 1200 ca.
3/4" 19,05 x 1,2 100-150-300 max. 1200 ca.
7/8" 22,22 x 1 100-150 max. 750 ca.
7/8" 22,22 x 1,2 100-150 max. 750 ca.

 

Dimensions OD
x wall thickness
Dimensions
wall thickness
LWC
weight
Weight
per Pallet
mm mm kg m
6 0,9-1 100-150-300 max. 1200 ca.
8 0,9-1 100-150-300 max. 1200 ca.
10 0,9-1 100-150-300 max. 1200 ca.
12 0,9-1 100-150-300 max. 1200 ca.
14 0,9-1 100-150-300 max. 1200 ca.
15 0,9-1 100-150-300 max. 1200 ca.
16 0,9-1 100-150-300 max. 1200 ca.
18 0,9-1 100-150-300 max. 1200 ca.
22 0,9-1 100-150 max. 750 ca.
28 0,9-1 100-150 max. 750 ca.

In compliance with the specific customer’s requirements, pipes can be produced according to different standardized regulations or, when requested, with different diameters, wall thicknesses and lengths, once the technical feasibility has been verified.